January Goals
I've done pretty well on my goals for January. After going through my goals posts from the end of 2007 and beginning of 2008 I've figured my goals are the following:
1. Reduce the stash
2. Try new yarns (from the stash)
3. Knit more Rockin' Sock Club socks
4. Knit a sweater
5. Finish old WIPs
So in January I did the following:
1. I bought 500g of yarn - all sock yarn - during the month of January. This includes sock clubs which I purchased last year but which arrived this year. I knit 200g from the stash. Not too shabby, almost all of it was sock clubs and "holiday" yarn purchases. Since I returned home to reside with my stash, I'm doing very well. ;)
2. I succeeded in this by trying the Panda Cotton (which I bought on my holiday trip) and Inspinknity. The Panda Cotton socks were started in December, so Inspinknity is my official January New Yarn.
3. I started my newest RSC package as soon as it arrived and I've made good progress so far. The yarn is wound and ready for Marble Arches as my February RSC sock.
4. No progress on the sweater yet.
5. I finished the Olympia socks this month, which were technically a 2007 WIP. I did frog Canal du Midi and make good progress on the California socks. I also found and made minimal progress on Mystic Sea - I intend to work more on those this month and finish them before sock camp in April for sure.
1. Reduce the stash
2. Try new yarns (from the stash)
3. Knit more Rockin' Sock Club socks
4. Knit a sweater
5. Finish old WIPs
So in January I did the following:
1. I bought 500g of yarn - all sock yarn - during the month of January. This includes sock clubs which I purchased last year but which arrived this year. I knit 200g from the stash. Not too shabby, almost all of it was sock clubs and "holiday" yarn purchases. Since I returned home to reside with my stash, I'm doing very well. ;)
2. I succeeded in this by trying the Panda Cotton (which I bought on my holiday trip) and Inspinknity. The Panda Cotton socks were started in December, so Inspinknity is my official January New Yarn.
3. I started my newest RSC package as soon as it arrived and I've made good progress so far. The yarn is wound and ready for Marble Arches as my February RSC sock.
4. No progress on the sweater yet.
5. I finished the Olympia socks this month, which were technically a 2007 WIP. I did frog Canal du Midi and make good progress on the California socks. I also found and made minimal progress on Mystic Sea - I intend to work more on those this month and finish them before sock camp in April for sure.
Labels: sock clubs, socks, stash, WIPs
1 Comments:
Knitting goals are hard, aren't they? I'm having a hard time not buying yarn, but I really need to get the stash under control.
Post a Comment
Subscribe to Post Comments [Atom]
<< Home